Rehabilitation - Lavalleja Building

2016

Construido
Encargo

Designers: Manuel Gonzalez Veglia, Dolores Menso

Contributors: Agostina Ramello, Paula Ilvento

Work: Nicolas Gordillo, Agostina Ramello

Structures: Fernando Mattiuz, Gustavo Lozano

Photographs: Gonzalo Viramonte

The commission consists of the repurposing and rehabilitation of an abandoned building constructed in the late 1960s.


We begin by identifying two problems to solve:

- Adapt the existing structure to the new program and therefore to the current regulations.

- To understand how the new building envelope could establish a dialogue between the existing architecture of the neighborhood and the new contemporary buildings in the area. The new building should be perceived as a sober, austere intervention.


By incorporating a large hollow reinforced concrete column (housing emergency stairs, restrooms, mechanical rooms, and water tanks) into an existing light well, it was possible to free up the original building's footprint and make it more flexible. This intervention also improves the structural integrity of the existing framework.


Regarding the building envelope, it was decided to use the existing setbacks in the original floor plan towards the south facade to place a series of partitions that function as vertical sunshades (protecting the glass from the summer afternoon sun) while at the same time shaping and supporting the facade, avoiding loading the cantilevers of the floor slabs.


On the ground floor, the facades are set back to free up the shop windows. Acting as an exoskeleton, this new envelope then begins to contribute not only to the building's performance in the face of the climate, but also to its structural integrity.